PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing shear wall panels at Stair -2-Elev. 4 (4th Floor) Facing South-West (800x600).jpg Rebar mats at Elev. 1,2,3 (4th Floor) Facing South-West (800x600).jpg Unbolting the shear wall panels at Stair -4 (3rd Floor) Facing North-East (800x600).jpg Compacting the Locker rooms Facing West (800x600).jpg Excavation at Rahway Ave. (800x600).jpg Excavation hafway across Rahway Ave. Facing North (800x600).jpg Installing and tying rebar mats at Elev. 1,2,3 (4th Floor) Facing South-East (800x600).jpg
Previous pageNext page Unbolting the shear wall panels at Stair -4 (3rd Floor) Facing North-East (800x600)
Unbolting the shear wall panels at Stair -4 (3rd Floor) Facing North-East (800x600)